Wednesday, May 6, 2009

Tile

Tile guys have been working furiously. They started Sun. and laid the cement board. Dan delivered the tile early Monday. This is Monday night. I can't wait to see it finished! We were over at the new house for an hour hanging out while our house was being shown. They liked the house, but didn't like the drop off in the yard. We loved the ravine behind us. No neighbors.

I hope it isn't too dark. They grouted Tues. and did the laundry room. Steve went over since he was off.

This is the beginnings of the laundry room.

Tues. was our last Northmoor-Edison Spring Musical called "Stay Tuned". It was theme songs from tv shows. The fourth graders sang Hey Hey We're the Monkees, Laverne and Shirley theme song, Wonder Years theme song, and Happy Days theme song. The performance was awesome. The two music teachers do a fantastic job w/ the students. Each grade performs 3-4 songs and the choir sings in between while the grades are switching back stage. They even get some of the teachers to dress up and perform. I got a little misty when the kindergarteners started, because I remember when my kids were that age. It goes by so quickly. I'm going to really miss Northmoor-Edison. I wish it was a K-8 school. Josie wore her Great Grandpa's Pabst bowling shirt and saddle shoes. She looked adorable. I'm uploading some of the videos from the concert if you would like to check it out.


Friday, May 1, 2009

Maybe we'll be finished in June

We've been busily painting. All the rooms are done, but the master bed and bath. We do have the color picked out now, so maybe they will get done this weekend.
Dan put the concrete column caps on the brickwork. Now we need to order the tapered columns that go on top. That is another job Dad and I are doing. This will probably be one of the last things.

We are thinking about putting slate around the fireplace and then pieces of trim. The slate has a variety of colors. The small ones have some metallic looking pieces in it.


Here is a 1/3 of the trim. It looks good as floor boards. We are running out of places to put it, so it is in the master bdrm.



I was checking out the tile we picked for the master bath. We added a sm. glass border in the shower and around the bath. I can't wait to see how it looks. The tile guy might start the end of next week. Everything is all picked out. We went to Leeway yesterday and picked out grout colors. I haven't seen the final cost yet, but at this point I don't care as long as it gets done.







Josie took this picture of the robin that built her nest really close to the house. She flies away whenever Shelby goes out the sliding doors.









Wednesday, April 22, 2009

Springtime craziness

Okay, okay - I haven't updated the blog lately. I have a list of excuses a mile long. It includes running around in circles every day. When I have been slaving away over at the house, I haven't remembered to take pictures. I think I have a few. But first here's the pics we had taken of the cousins Easter weekend. We had them taken at Portrait Innovations and they give you a CD of the pics. I see they give you the pics uncropped, but you get the idea of how beautiful they are. Jackie, 13, Cassie, 11, Josie, 9, and Harry, 9. I should just scan the good pics we bought in. In this picture is my mom w/ the grandbabies.


And here's a pic of me and the girls. Do they look like me?!?


Steve just called from the house. He went over to finish painting the basement stairs. He had to buy a plank from Lowe's, so he could reach the ceiling. Not one of my jobs. Looks like this weekend will be nice to put the clear coats on the trim. I'll check the camera for new pics and update later.



Tuesday, April 14, 2009

Spring Break

Spring break was nice, but I was too tired to blog. I painted from Sun. to Sat. and I think after this I won't ever want to paint again. This is the Easter get together at Butler Haynes Park on Sat. 04/04. Jackie's not too old to hunt for candy.

On Monday, we couldn't paint until the drywall guys were done and cleaned up. The girls got haircuts at Great Clips where my cousin Patrick works. Jackie got a trim and Josie got about 3 inches off. It looks cute though and doesn't tangle as much.On Tues. we started painting after my hair appt. Here's Josie taking a break in the tub. She didn't last long painting.Picnic in the dining room. On Wed. they brought over the DVD player and watched movies while I painted. Thurs. Dad, Jackie and I stained > 3/4 of the trim in the basement. There was stain everywhere. I think we might do the clear coating outside. Friday the Barretts got here around 12. The kids stayed w/ Grandma at my house, and Tami and I painted. Erik wasn't feeling well, so he bailed.
Here's Cassie and Jo painting Josie's room blue.


Harry is trimming the corners.

Jackie is a very hard worker! She has primed walls, stained trim and painted walls this week. I told her we should work on her Home Improvement badge for Girl Scouts. She also doesn't complain. Josie on the other hand is tired after about 15 minutes of painting.

We had the cousins pictures taken on Sat. morning. They turned out really good. I'll have to add them later after I scan them in. The kids are getting so big.


Sunday - Easter egg hunt at Grandma and Grandpa's. Josie is searching.




Cassie and Jackie are dashing for eggs. Harry wasn't feeling well, so he didn't pick up much. Erik, Grandma and I went after they were done and found some candy too.
The concrete guys put the forms in on Thurs., but it has been too rainy to pour the driveway and sidwalks. Hopefully tomorrow. Derrick the electrician called on Mon. afternoon, and they are going to put in the can lights and some more outlets tomorrow, which will help alot.
All the walls are primed and ceilings painted (except the basement stairs). Jackie and Josie's rooms are done. Now we are working on the kitchen/greatroom/foyer/dining room.

Wednesday, April 1, 2009

Taping and Mudding

Jackie helped Dad and I plane the 500 linear ft of base. The 1X6 lumber had to go thru the planer twice. It only took us 2 hrs. and then we went to McDs for breakfast. She was a great help. It helped to have another pair of hands to move the lumber around.
They finished the drywall and cleaned up the garage. It is ready for the cabinets to be delivered. The taper guys set up their stuff on Thurs, but couldn't get started, because they needed a water faucet installed in the basement. Plumber installed the faucet on Fri., so they can start on Mon.
Look at all the "mud".

These are the stilts they use to do the ceilings. I should have went over during the week to see this process, but I'm swamped at work. Trying to wrap up 3 experiments, so I can take next week off. I may have to go in for a couple hours during spring break, but I will probably need a break from painting.


I'm still trying to imagine what the island is going to look like. We are also still discussing the dilemma of tile vs. wood in the kitchen. Wood will be the easiest, but not my first choice.

They are keeping the house at 70o. It is so toasty in there. Makes me want to stay. They are trying get the moisture out of the house. On Friday the dehumidifier in the basement said 83% and by Sunday it was 70%. I think we are going to have to purchase a dehumidifier, because I think the basement is always going to stay "wet".
We took our friends over on Sunday after pizza to check it out. The kids played hide and seek.

Dan called today while I was home with Josie. (She stayed home with a touch of the stomach bug.) There are some wall texture examples in the kitchen they want us to decide on. 1 called stomp for the ceiling of plain walls, 1 called orange peel (as seen above) and 1 called knock down. I think we are going to go with orange peel.

Everything looks good and smooth. Ready for painting. I'm ready to get started.

Saturday Dad and I are going shopping for a paint sprayer and stain sprayer, and the primer. I hope to get started on Sat. Steve has to work and the kids are going to a Easter get-together, so it will just be me. I love it!!